We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Assembly Line Equipment.
ipros is IPROS GMS ・ IPROS One of the largest technical database sites in Japan that collects information on.

Assembly Line Equipment - List of Manufacturers, Suppliers, Companies and Products | IPROS GMS

Assembly Line Equipment Product List

1~2 item / All 2 items

Displayed results

Production site - Assembly and Inspection

The assembly line has established a flexible production process to accommodate a variety of products!

We would like to introduce our "Production Site - Assembly and Inspection." Our assembly line is designed with a flexible production process to accommodate a variety of products. Please feel free to contact us when you need assistance. 【Overview】 ■ Assembly Line ■ Assembly Line: Manual Soldering Process ■ Assembly Line: Adhesive Application, etc. ■ Assembly Line: Laser Printing ■ Assembly Line: Stamping *For more details, please download the PDF or feel free to contact us.

  • Contract manufacturing
  • Assembly Line Equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reducing rework FAT/SAT production line startup Thermix

What we need to confirm is not whether the equipment is completed, but whether we can move on to mass production.

Despite having confirmed the equipment with the manufacturer, it stops once installed, and the acceptance criteria are unclear, making it impossible to decide on moving to mass production. Thermix designs FAT and SAT (Factory Acceptance Test and Site Acceptance Test) not as confirmations of equipment completion, but as criteria for transitioning to mass production, validating everything from actual work, abnormal recovery, inter-equipment coordination, operation, maintenance, to data recording as part of the production line. We do not only observe normal operation; we intentionally induce situations such as missed captures, undetected sensors, unacceptable receiving at the transport destination, inspection failures, material shortages, communication interruptions, and restarts after emergency stops, to confirm where human intervention is needed. If sufficient actual work cannot be prepared, we separate the items that can be confirmed during FAT from those carried over to SAT and leave them in the acceptance plan. “Passed FAT but stops on-site” → Implementing step-by-step from individual tests to inter-equipment integration. “Cannot determine acceptance criteria” → Judging based on capability, quality, abnormal recovery, operation maintenance, and data. “Too many issues to move to mass production” → Managing priorities based on the impact on the start of mass production. “Involvement of multiple equipment manufacturers” → Sharing and adjusting responsibility boundaries and test items at the upstream stage. “On-site modifications are not reflected in the drawings” → Confirming the scope of changes and reflecting them in the official data. Please consult us regarding the scope of FAT and SAT from the estimation and specification stages.

  • Machinery and equipment installation/dismantling/relocation
  • Mechanical Design
  • Other FA equipment
  • Assembly Line Equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration